1.Pay attention to the installing position and height which must meet the design standard requirement.
2.The flow direction of medium should be consistent with direction of arrow marked on the wafer check valve body.
3.Tighten the bolts and nuts well at the connection to prevent any leakage of working medium.
4.Horizontal or vertical position when install valve .
5.Pay attention to leave enough space when install this wafer check valve nears the elbow.
6.When install this wafer check valve at the outlet of the water pump, at least six times the diameter of valve should flow out to ensure that plate can be ultimately affected by the fluid.